Every opening matched. Every fire rating verified. Every RFI drafted with the citation.
120+ manufacturer price books baked into the model. Architects spec hardware sets, finishes, and frame conditions that no manufacturer actually produces. The AI catches it, maps every line to a real product, and builds the full BOQ and BOM.
Forty to eighty hours per mid-size project. One revision restarts the cross-walk. Not anymore.
Estimators flip between Div 08 11/12/13/14/71, A-sheets, and Section 08 71 00 hardware sets. 200-1,000+ openings. Forty to eighty hours per project.
DIV 08 11 · 08 12 · 08 13 · 08 14 · 08 71The model reads all five sections plus the door + frame + HW schedules. Builds the opening-by-opening table. Updates on every addendum.
142 openings · 4 min · zero re-entryNon-labeled frame on a stair opening. Wrong closer/latch combo. AHJ rejection. 8-16 week reorder. Schedule and margin gone.
NFPA 80 · UL 10C · IBC 716Each rated opening cross-checked: frame label, door label, closer required, smoke seal where required. Mismatch raises a flag on the opening with the citation.
NFPA 80 §6.4 · auto-flagMatching every HW line to current pricing, finish code (US26D / 626), lead time, and discontinued SKUs across Allegion, ASSA ABLOY, Hager, Stanley, Sargent.
Excel · stale · error-proneEvery hardware spec auto-maps to the vendor SKU. Live priced from distributor feeds. Discontinued parts get ranked alternates with delta-cost and lead-time impact.
Allegion · ASSA · dormakaba · Hager · 116 moreWrong frame profile for a 1-3/4" door. Strike side undersized. Hinge backset wrong for the prep. Discovered when the installer arrives. Change order, restock fee, delay.
Field discovery · always too lateProfile, jamb depth, hand, swing, strike prep, hinge backset - all cross-checked. Each conflict shows which sheet disagreed with which schedule. Visual red flag.
Bid-side · pre-submit · auditablePush-side vs. pull-side maneuvering clearances per leaf. Closer force at fire doors. Reach to operating hardware. Spotted late, fixed expensively.
ADA §404 · ICC A117.1The model reads the plan, derives clearances per leaf, checks against ADA §404.2.4 and ICC A117.1. Flags non-conforming openings with the dimension and citation.
§404.2.4 · §404.2.5 · auto-verifyEvery conflict turns into a Word doc. Find the spec section. Find the sheet ref. Write the question. Send. Track. Re-send when the answer comes.
Manual · low-leverageEach flagged conflict generates an RFI with the spec section, sheet ref, opening number, and the question. Routed to the architect. Answers feed back into the bid.
Spec § · sheet ref · auto-draft142 openings on the left. 12 hardware sets on the right. Connectors draw as the AI matches. One mismatch flagged red.
Six standards run on every opening. Each flag carries the section, the sheet, and the reason. Defensible at AHJ review.
Every flagged conflict generates a draft RFI. Spec section, sheet ref, opening number, and the actual question. Routed to the architect. Answers feed back into the bid.
Five things every DFH estimator wants to know before the demo call.
20-minute demo. Bring a real spec - door schedule, frame schedule, hardware section. We'll run it through Preqonn AI and walk the output.
Book a Demo →