Openings · Division 08 · Trade 01

Doors, frames, hardware. Solved.

Every opening matched. Every fire rating verified. Every RFI drafted with the citation.

Price books
0vendors
Codes checked
0standards
Hours saved
0per job
The wedge

Every spec, mapped to what manufacturers actually make.

120+ manufacturer price books baked into the model. Architects spec hardware sets, finishes, and frame conditions that no manufacturer actually produces. The AI catches it, maps every line to a real product, and builds the full BOQ and BOM.

0+
Price books · live · always current
SchlageLocksets · Cylindrical
AllegionGroup · 30+ brands
ASSA ABLOYGroup · Sargent · Yale
dormakabaClosers · EAC
LCNClosers · 4040 / 1460
von DuprinExit devices
Sargent8200 / 80 series
HagerHinges · Continuous
StanleyHinges · BB1279
ABHContinuous hinges
RixsonPivots · 27 / 595
+ 109 moreTrimco · Rockwood · Pemko
Sync interval · nightly Finish codes mapped · US26D / 626 / 630 Discontinued items · auto-flagged Lead times · live · per distributor
Six pains · six fixes

The way it used to be. And the way it works now.

Forty to eighty hours per mid-size project. One revision restarts the cross-walk. Not anymore.

01
Pain

Cross-walking five spec sections by hand.

Estimators flip between Div 08 11/12/13/14/71, A-sheets, and Section 08 71 00 hardware sets. 200-1,000+ openings. Forty to eighty hours per project.

DIV 08 11 · 08 12 · 08 13 · 08 14 · 08 71
Preqonn

One pass. Every opening reconciled.

The model reads all five sections plus the door + frame + HW schedules. Builds the opening-by-opening table. Updates on every addendum.

142 openings · 4 min · zero re-entry
02
Pain

Fire-rating misses on labeled openings.

Non-labeled frame on a stair opening. Wrong closer/latch combo. AHJ rejection. 8-16 week reorder. Schedule and margin gone.

NFPA 80 · UL 10C · IBC 716
Preqonn

Every label verified against the assembly.

Each rated opening cross-checked: frame label, door label, closer required, smoke seal where required. Mismatch raises a flag on the opening with the citation.

NFPA 80 §6.4 · auto-flag
03
Pain

120+ price books, updated in Excel.

Matching every HW line to current pricing, finish code (US26D / 626), lead time, and discontinued SKUs across Allegion, ASSA ABLOY, Hager, Stanley, Sargent.

Excel · stale · error-prone
Preqonn

Live pricing, line by line.

Every hardware spec auto-maps to the vendor SKU. Live priced from distributor feeds. Discontinued parts get ranked alternates with delta-cost and lead-time impact.

Allegion · ASSA · dormakaba · Hager · 116 more
04
Pain

Door / frame / HW mismatches caught at install.

Wrong frame profile for a 1-3/4" door. Strike side undersized. Hinge backset wrong for the prep. Discovered when the installer arrives. Change order, restock fee, delay.

Field discovery · always too late
Preqonn

Conflicts flagged before bid submit.

Profile, jamb depth, hand, swing, strike prep, hinge backset - all cross-checked. Each conflict shows which sheet disagreed with which schedule. Visual red flag.

Bid-side · pre-submit · auditable
05
Pain

ADA clearance checked by gut.

Push-side vs. pull-side maneuvering clearances per leaf. Closer force at fire doors. Reach to operating hardware. Spotted late, fixed expensively.

ADA §404 · ICC A117.1
Preqonn

ADA cleared opening by opening.

The model reads the plan, derives clearances per leaf, checks against ADA §404.2.4 and ICC A117.1. Flags non-conforming openings with the dimension and citation.

§404.2.4 · §404.2.5 · auto-verify
06
Pain

RFIs written from scratch.

Every conflict turns into a Word doc. Find the spec section. Find the sheet ref. Write the question. Send. Track. Re-send when the answer comes.

Manual · low-leverage
Preqonn

RFIs drafted, cited, sent.

Each flagged conflict generates an RFI with the spec section, sheet ref, opening number, and the question. Routed to the architect. Answers feed back into the bid.

Spec § · sheet ref · auto-draft
Hardware set matching

Every opening, matched to its set.

142 openings on the left. 12 hardware sets on the right. Connectors draw as the AI matches. One mismatch flagged red.

Door schedule · A801 142 openings
101A 3'0"×7'0" · SC oak90 min · stair vestibule HW-1
102 3'0"×7'0" · HM 18ga60 min · corridor HW-2
103 3'0"×7'0" · SC oak90 min · stair vestibule HW-1
104A 3'6"×7'0" · HM90 min · cross-corridor HW-3
105 3'0"×7'0" · SC oakADA reach mismatch · §404.2.4 RFI 04
106 6'0"×7'0" · oak pair90 min · auditorium HW-4
HW sets · 08 71 00 12 sets
HW-1 Stair · 90 minSchlage ND · LCN 4040 · 26D 14 dr
HW-2 Corridor · 60 minSargent 8200 · LCN 1460 38 dr
HW-3 Cross-corridor · 90 minvon Duprin 99 · LCN 4111 8 dr
HW-4 Auditorium pairRixson pivot · 27 · von Duprin 9947 4 pr
HW-5 Office passageSchlage AL · ABH 1340 62 dr
··· 7 more setsMech / electric / restroom / exterior 16 dr
Codes · auto-checked

Every citation. Every opening.

Six standards run on every opening. Each flag carries the section, the sheet, and the reason. Defensible at AHJ review.

NFPA 80 §6.4Field-modification + label-protection for fire-door assemblies. Auto-checked at each labeled opening.
Fire doors
NFPA 105Smoke-door gasketing + perimeter sealing requirements. Validated against smoke-barrier plans.
Smoke barriers
ADA §404.2.4Maneuvering clearances at swinging doors. Push, pull, hinge-side, latch-side. Per leaf.
Accessibility
IBC §1010.1.10Means-of-egress door operations + panic hardware. Cross-checked against occupancy load.
Egress
UL 10CPositive-pressure fire test ratings. Frame + door + hardware combination verified against the listing.
Listings
ICC A117.1Operable parts, reach ranges, hardware mounting heights. Run on every accessible opening.
Reach + ops
Auto-drafted

RFIs that cite themselves.

Every flagged conflict generates a draft RFI. Spec section, sheet ref, opening number, and the actual question. Routed to the architect. Answers feed back into the bid.

Citation Spec 08 71 00 §2.3.B
Sheet ref A801 · A302
Opening Door 105
Code ADA §404.2.4
RFI · 04 · 2026-05-21 Draft
Project
Lakeline Tower · Building B · Floor 03
To
Architect of record · c/o RFI portal
Re
Door 105 · 20-minute label vs. ADA reach
Refs
A801 · door schedule  A302 · corridor enlarged plan  Spec 08 71 00 §2.3.B
Question
Schedule A801 lists Door 105 as a 20-min labeled opening with HW-1 (SC oak, 1-3/4"). HW-1 specifies LCN 4040 closer with a 8-1/2 lb operating force. ADA §404.2.4 requires 5 lb max at this opening. Confirm: revise to listed 20-min label with reduced-force closer, or relocate the rated boundary?
Conflict detected · ADA §404.2.4 reach allowance vs. HW-1 closer force. Two paths offered with delta-cost and lead-time in attached BOM.
Signed · J. Mercer, Sr. Estimator Auto-drafted · verified · ready to send
FAQ

The questions DFH buyers actually ask.

Five things every DFH estimator wants to know before the demo call.

A configurator makes you enter doors one at a time. We're an AI bid operator. We read the spec, build the opening-by-opening table, match every hardware set, run the code checks, draft the RFIs, and produce a priced BOM with alternates. The senior estimator signs the number.
120+ vendors covering Allegion (Schlage, von Duprin, LCN, Ives), ASSA ABLOY (Sargent, Yale, Corbin Russwin, Rixson), dormakaba, Hager, Stanley, ABH, Trimco, Rockwood, Pemko, and 100+ more. Updated nightly from distributor feeds. Discontinued items auto-flagged with ranked alternates.
Yes. The model reads the electrified-hardware riser and the access-control spec (28 13 00). It maps power transfers, electric strikes, mag locks, and request-to-exit devices to the right openings, verifies fail-safe vs. fail-secure per IBC §1010, and produces a coordinated BOM that lines up with the EC scope.
Every addendum is diffed against the prior version. Affected openings light up, the hardware-set assignments re-resolve, code checks re-run, and the priced BOM updates. You see exactly what changed and what the cost delta is, before you re-submit.
A senior DFH estimator. Every output is human-verified before delivery. The AI does the cross-walk and the citations. The estimator signs the number. That's what makes it defensible at AHJ review and at change-order time.
Try it

See it work on your live bid.

20-minute demo. Bring a real spec - door schedule, frame schedule, hardware section. We'll run it through Preqonn AI and walk the output.

Book a Demo
Bring a real PDF Output stays yours 20-minute walkthrough
Preqonn AI
Book a demo →